Prepare the information before planning a meter move.
Use this checklist to prepare an enquiry and coordinate renovation work. Feasibility, responsibilities and fees depend on the site assessment and written proposal.
Five steps from the existing position to a written proposal.
Gather the information already available. Mark any unresolved points for confirmation.
Record the existing position
Provide the property name, floor and photographs of the existing meter and its surroundings, taken from a safely accessible position. Do not dismantle, move or test an installation to prepare an enquiry.
Mark the proposed position
Mark the intended position on an available plan, cabinet layout or photograph. If no drawing is available, describe the purpose of the move. The proposed position is a starting point for assessment, not confirmation of feasibility.
Explain the renovation stage
State whether cabinets have been removed, new cabinets ordered or other trades arranged, together with your preferred timing. This helps discuss the work sequence. There is no need to open up existing installations before making an enquiry.
Prepare coordination information
Identify the roles of the owner, renovation contractor and property manager. Gather any existing access requirements or consultant information. The relevant parties should confirm responsibilities and how information will be shared.
Confirm the written scope before arranging work
Check the meter-related work, connected pipework, labour, materials, other trades and completion information covered by the proposal. Coordinate subsequent fixed installations after the position, scope and work sequence have been confirmed.
A brief to share with your renovation team
Copy these points into an email or enquiry. Share available drawings and photographs after the receiving method has been agreed.
Property and existing position
Property or building: ______ Floor / work location: ______
The proposed change
Purpose of the move: ______ Proposed position marked: yes / not yet
Renovation arrangements
Current stage: ______ Preferred timing: ______
Available information
Current photos / floor plan / cabinet layout / management requirements: ______
Questions to discuss first
Feasibility / pipework scope / coordination / quotation items: ______
Questions before making an enquiry
Can I enquire without drawings?
Start with the existing meter position, intended position, renovation purpose and current photographs. Any further information needed will depend on the project discussion and site assessment.
Can photos confirm the final position or price?
Photographs support an initial discussion but may not show every route, connection or access constraint. The final position, scope, fees and arrangements require assessment and written confirmation.
Is a site assessment free?
Confirm any visit, inspection or quotation fees before arranging them. This checklist does not promise a free assessment, feasibility or a completion time.
Start with the information you already have
Select the gas meter relocation service and describe the points above. The existing service page provides quotation comparison items. Refer to the website contact page for contact and receiving arrangements.