Compare proposals against the same work scope.
This checklist helps property managers, owners’ corporations and consultants organise requirements and comparison points. It is not a price list, liability decision or site-specific work recommendation.
Seven points to check in each proposal.
For each point, note proposal A, proposal B and anything still to be confirmed. Ask the relevant parties to explain differences.
Locations and pipe sections
Identify buildings, floors, locations, sections and quantities in each proposal, and compare the same scope. Clarify the boundaries and arrangements involving communal or household locations separately.
Materials and fittings
Check the listed pipework, connections and related materials, including whether specifications and quantities are clear. Similar totals do not establish that materials or scopes are equivalent.
Access and site coordination
Confirm whether scaffolding, platforms or other access arrangements are needed, who arranges them and whether costs are included. Requirements depend on site conditions.
Other trades and making good
Identify affected finishes or other installations and the associated arrangements. Record included and excluded work clearly.
Checks and completion information
Identify the inspections, tests, work photographs and completion information in the proposal, and who needs to confirm handover requirements. Records must reflect the actual work.
Additional work and changes
Record how extra pipe sections, site findings or proposal changes will be handled. Confirm revised scope, fees and approval arrangements before proceeding with the affected work.
Sequence, coordination and resident impact
Compare the proposed sequence, coordination needs and communication arrangements. Suitability for phasing, access and supply restoration timing depend on site risks, scope and coordination.
A project brief before assessment
Fill in the information already available and mark unresolved points for confirmation. Agree how photographs and documents will be received separately.
Project information
Estate or building: ______ Blocks / floors / locations involved: ______
Existing information
Photos / engineering reports / notices / drawings / current quotations: ______
Scope to discuss
Repair / replacement / maintenance arrangements / other: ______ Known constraints: ______
People and coordination
Property manager / owners’ corporation / consultant roles: ______ Access or related work: ______
Points to confirm
Responsibilities and scope / inclusions and exclusions / phasing / handover requirements: ______
Questions when comparing proposals
Does this checklist determine maintenance liability?
No. It organises locations, work and comparison information; it does not determine who is responsible or pays. Responsibilities, scope and work allocation require separate confirmation using the applicable information and arrangements.
Can work be carried out in stages?
Phasing can be discussed following assessment, but suitability depends on site risks, scope and coordination. The existing Hiu Lai Court story describes that project and should not be applied automatically to another estate.
How can maintenance arrangements be compared with one-off work?
Compare the contract term, pipework covered, inclusions, exclusions, fee calculation and exceptions separately. Refund, warranty and other arrangements must follow the individual written proposal and contract, rather than a promotional summary.
Give the discussion a shared basis
Gather the checklist with existing notices, reports and drawings. Refer to the existing contract stories for project experience, then discuss assessment and proposals for your estate. A published case is not a promise for another estate.